How it Works
No Straight Run     
Required     
High Accuracy and     
Extended Turndown     
Models and     
Specifications     
Applications
Sizing Software
  Ordering Information

Accelabar Model Selection
1. Furnish your flowing conditions. A flow calculation is required to determine the DP and verfifcation of the operating limits.
  • Each Meter size has a standard beta ratio sized for the optimal range.
  • The maximum operating limits are determined by the Accelabar flow calculation.


2. If your flowing conditions exceed the operating limits, a larger or smaller model (meter size) must be selected.